The report discusses the role of advanced pyroprocessing systems in upgrading power plants. Holtec's Chief General Manager, Kamal Kumar, suggests that it is better to exploit the inherent control and optimization potential in the design margins of power plants being conceived or installed. The use of composite construction systems offered by Holtec can reduce time and cost, and the company's integrated services method can reduce time and cost further. Automation, instrumentation, and at the unit level are also crucial for efficient plant control systems. Recent developments in pyroprocessing WHR installations are expected to grow exponentially in the coming years, and new technologies such as intelligent control and communication systems are being used. However, a significant portion of the potential from new plants is restricted by the cost of waste heat from the pre-heater and cooler, which can lead to unexpected costs for the client. The current economic crisis restricts manufacturers from investing in plant upgrades, but minor investments in retrofitting can overcome this challenge. The industry is currently facing challenges in overcoming these restrictions, but with the right approach, it can be overcome.